Sep 2026
We've built an external kitchen with a steel frame, cement sheet (easylap) cladding for the tiles. We've installed the stainless steel doors, drawers, rubbish bin and shelves.
Sep 2026
We've built an external kitchen with a steel frame, cement sheet (easylap) cladding for the tiles. We've installed the stainless steel doors, drawers, rubbish bin and shelves.
May 2026
Last part of this job. Installation of a new door and a new window with customised reveals. We've built a double walls to hide the bricks. The walls have been insulated, a termite barrier has been installed and new chamfer boards have been installed
May 2026
May 2026
New entry door and hardware. The ground floor has been re framed to be 70mm of the ground with a termite barier. The concrete outside has be demolished by others as there was no step down from inside to outside.
Apr 2026
Going from tarps to a house. The concrete was at the same height from inside to outside so it had to be cut to create a stepdown for water infiltration. A new frame has been built and a termite barrier has been installed with a z flashing. A new door and window have been installed as well. More to come..
Mar 2026
2 bathrooms renovated: The ensuite was 900mm wide, We demolished the wall to extend it to 1200mm
Feb 2026
A storage room under a queenslander converted in a bedroom.
Send me a few photos and a short description. I'll visit and give you a detailed quote within 7 days.